–
+
<<
>>
home / sectors / commerce & industry
01
02
03
04
05
06
07
08
09
10
commerce & industry
- logistic & assembly shop with administration offices, koblenz, de 2013 - 2014
- diagnostic software-test facilities for vehicles, munic, de 2013
- storage facility for gear mechanism logistics, daimler ag, rastatt, de 2012
- intermediate storage facility for gear boxes, daimler ag, rastatt, de 2012
- new primary air traffic control facility manchester, uk 2012
- rolls royce manufacturing building in derby sinfin, uk 2004 – 2005
- business park raunheim, de 1998
- business park wanheim in düsseldorf, de 1998
- abattoir bugulma, tatarstan, russia 1995
[ please move over project to get more information. ]

logistics & assembly shop with administration offices
logistic hall with high-bay racking and multi-storey small components warehouse. assembly shop with intermediate platform, goods delivery areas. administration building with technical plants, social areas and offices. apporximately total area 12.000 m².
location: koblenz, germany
for: kohlbecker architects & engineers, gaggenau / germany
role: project leading architect as gerneral planner
years: 2013 - 14
work stages: B - K
diagnostic software-test facilities for vehicles
planning permission for a change in use of a former assembly hall for harman becker automotive systems gmbh.
location: munic / germany
for: kohlbecker architects & engineers, gaggenau / germany
role: job-running architect
year: 2013
work stage: E
storage facility for gear mechanism logistics
planning permission for an extension at the daimler works gaggenau at the plant in rastatt.
location: rastatt / germany
for: kohlbecker architects & engineers, gaggenau / germany
role: job-running architect
year: 2012
work stage: E
intermediate storage facility for gear boxes
planning permission for an aluminium marquee (approx. 1370 m² area) at the daimler works gaggenau at the plant in rastatt.
location: rastatt / germany
for: kohlbecker architects & engineers, gaggenau / germany
role: job-running architect
year: 2012
work stage: E
new primary air traffic control facility, manchester airport
approx. 60m tall new tower building with visual control room, apron & fire watch and additional technical facilities. base building with administration & staff offices, medical, training, simulator and approach control rooms, storage & changing facilities.
location: manchester
for: CPMG architects, nottingham
role: design team member
year: 2012
work stage: K
contractor: morgan sindall
rolls royce, derby
£10m industrial manufacturing ‘compressions systems’ building with approx. 26,000sqm of workshop area including central operation support offices, conference rooms, break and toilet areas
location: derby sinfin / east midlands
for: CPMG architects, nottingham
role: design team member
year: 2004 – 2005
work stage: C – E
contractor: interserve
business park raunheim
offices with service areas for business and industry
location: raunheim near frankfurt a.m. / germany
for: dietsch & partner versorgungstechnik gmbh,
building services engineer in trier
role: freelancer, design drawings & application drawings
year: 1998
work stage: D – german HOAI: LPH 4
business park wanheim
offices with service areas for business and industry
location: düsseldorf / germany
for: dietsch & partner versorgungstechnik gmbh,
building services engineer in trier
role: freelancer, design drawings & contract drawings
year: 1998
work stage: C – german HOAI: LPH 3
abattoir in bugulma
location: bugulma / tatarstan / russia
for: geiser & kaefer architects, trier / germany
role: freelancer, design & construction drawings
year: 1995
work stage: D – german HOAI: LPH 4